Chevalia Estate 2 | Emaar | Grand Polo Club & Resorts, Dubai



About this Development
Chevalia Fields - Curated Equestrian Lifestyle
Chevalia Fields at Grand Polo Club & Resort is where equestrian heritage meets the future of luxury living. Designed to harmonize leisure, nature, wellness, and connectivity, the masterplan seamlessly blends modern architecture with sweeping green landscapes, fostering a sense of community and belonging. At the heart lies The Green Core, featuring three majestic polo fields, a luxury clubhouse, and private stables - an epicenter of prestige, calm, and timeless elegance.
The Clubhouse stands as a contemporary architectural icon, merging Arabian heritage with modern design to create spaces that connect and inspire. The Polo Fields, spanning 340,000 sqm, celebrate the grace of horses and the spirit of riders, while the Stables offer a sculptural sanctuary with circular forms, vibrant courtyards, and serene water features - an ode to equestrian motion and majesty.
Recreation and leisure are elevated to an art form, from the dynamic Galloping Fountain and art pavilion to padel courts, open lawns, and thoughtfully designed resting areas. Every element encourages joy, connection, and reflection amidst nature’s beauty.
Chevalia Fields’ collection of 4- and 5-bedroom villas embodies the elegance of equestrian form and contemporary luxury. Set along the verdant Green Core, these homes feature lustrous marble, refined woodwork, and panoramic views that bring light and life into every space. Here, each day unfolds not only in beauty but with a profound sense of belonging - where freedom, elegance, and nature coexist in perfect harmony
Price
Type |
Avg. BUA (sq.ft.) |
Avg.Plot Area (sq.ft) |
Starting Price (AED Million) |
4 Bed Luxury |
4,168 |
5,794 |
7.88 Mn |
5 Bed Ultra Luxury |
5,046 |
6,057 |
10.03 Mn |
5 Bed Equestrian Luxury |
8,635 |
9,149 |
17.61 Mn |
Payment Plan
Payment Plan |
Payment Percentage |
Down Payment (On Booking) |
10% |
During Construction |
70% |
On Completion |
20% |
*Estimated Construction Completion Date - Jun 2029 |
Project Features
-
BBQ Area
-
The Clubhouse
-
The Stables